New capacity – Gansu Binnong Technology Co., Ltd. has received approval from the Lanzhou New Area Ecological and Environmental Bureau for a new pilot production line to manufacture 1,200 t/a Tembotrione TC. This is part of a larger project involving the production of 22,000 t/a pesticides and intermediates.
The first phase of the 22,000 t/a project includes the construction of production lines for 9,000 t/a Methyldiethoxyphosphine, 5,000 t/a Glufosinate, which was completed in August 2021, with environmental clearance obtained, and operations commenced in September 2021. Environmental protection acceptance for phase one was finalized in April 2024.
However, to meet market demands and validate production processes, Gansu Binnong has decided to discontinue its plans for producing Bentazone in the 22,000 t/a project. Instead, the company will repurpose an existing drying facility to create a new Tembotrione TC line.
Gansu Binnong: Current product capacity
| NO | Product | Concentration | Designed capacity, t/a | Annual Operating Hours (h) | Location | Operation time | Remarks |
| 1 | Methyldiethoxyphosphine | ≥97% | 9000 | 7560 | Methyldiethoxyphosphine Synthesis Workshop | Phase I | Completed and Accepted |
| 2 | Glufosinate DP | ≥97% | 4500 | 7200 | Glufosinate Phase I Synthesis Workshop, Glufosinate Phase I Drying Workshop | Phase I | Completed and Accepted |
| 3 | Bentazone | ≥97% | 3000 | 7200 | Glufosinate Phase II Synthesis Workshop, Bentazone Synthesis Workshop, Bentazone Drying Workshop | Phase II | to change to 1,200 t/a Tembotrione 97% TC |
| 4 | Ammonium chloride (by-product) | ≥99% | 7640 | 7560 | Methyldiethoxyphosphine Synthesis Workshop, Glufosinate Phase I Synthesis Workshop, Glufosinate Phase I Drying Workshop | Phase I | Completed and Accepted |
| 5 | Trisodium phosphate (by-product) | ≥98% | 850 | 7200 | Bentazone Synthesis Workshop, Bentazone Drying Workshop | Phase II | Not Built, Cancelled Construction |
| 6 | Glufosinate Ammonium AS (by-product) | ≥22% | 4700 | 7200 | Glufosinate Phase I Synthesis Workshop, Glufosinate Phase II Synthesis Workshop | Phase I | Completed and Accepted |
| 7 | Hydrochloric Acid (by-product) | ≥20% | 3000 | 7200 | Glufosinate Phase I Synthesis Workshop, Glufosinate Phase II Synthesis Workshop | Phase II | Under Construction |
Gansu Binnong Technology Co., Ltd. was established on August 5, 2020, in Lanzhou New Area, Gansu Province. It is a wholly-owned subsidiary of Shandong Binnong Technology Co., Ltd. The company is registered with a capital of RMB 300 million and is engaged in the production and sale of pesticides and related chemical products.